CUSTOM PROJECT / INDUSTRIAL LIGHTING

3 PHASE LIGHTING CONTROL

A self-contained SLM42 pedestal that puts high-capacity power, four-zone scheduling and a serviceable disconnect exactly where the facility needs it.

01 / PROJECT OVERVIEW

POWER

PLACED

WHERE IT

PERFORMS BEST.

A large industrial faciliy needed to power and control multiple groups of three-phase lighting across a sprawling parking lot. Instead of starting every run inside the building, the design team placed one custom PSI pedestal at the lot’s most electrically adventageous location.

4 zones

INDEPENDENT CONTROL

16

PROGRAM OPTIONS

24 circuits

DISTRIBUTION CAPACITY

02 / THE CHALLENGE

ONE PROPERTY.

FOUR DIFFERENT

NEEDS.

Parking, perimeter security and pedestrian lighting do not all operate on the same schedule. The facility needed reliable zone control without long interior-fed cable runs, exposed photo eyes or routine access to a secured building.


Contractors needed an exterior disconnect without entering the building.

Access and serviceability


Reliability outdoors

Photo eyes were vulnerable to tampering, damage and false triggering.


Different schedules

Each lighting group required its own programmed on and off times.


Run length and cost

Interior distribution meant longer cable runs, more copper and more labour.

03 / THE SOLUTION

A COMPLETE CONTROL

CENTRE OUTDOORS.

PSI combined the main disconnect, circuit distribution and programmable lighting control inside one secure, weather-resistant enclosure.

Built to control the
entire lot.

The four-channel astronomic timer automatically follows seasonal sunrise and sunset changes while keeping every lighting zone independently programmable.

Incoming power
120/208VAC, 3 phase
Main protection
100A main breaker
Load centre
24 circuits
Timer
Intermatic astronomic
Scheduling
4 channels · 16 configurations
Installation
Precast concrete base

STRATEGIC PLACEMENT

Shorter runs start with a smarter location.

Positioning the pedestal centrally to the fixture groups reduced home-run distances, voltage drop, copper quantities and installation labour.

The exterior line-of-sight disconnect also lets a licensed contractor safely isolate power without coordinating building access.

04 / RESULTS

BETTER CONTROL.

EASIER SERVICE.

The finished pedestal simplified the electrical layout and gave the facility a more dependable way to manage seveal lighting applications from one secure outdoor location.

01

Reduced cable and labour

Central placement shortened runs to the fixture groups across the property.

02

No building access

Routine servicing and emergency shutoff can happen from outside.

03

Automatic seasonal control

The astronomic timer adjusts with sunrise and sunset throughout the year.

04

Tamper-resistant operation

No exposed photo eyes or external control targets are required.

05

Four independent zones

Different lighting applications can run on different schedules simultaneously.

06

Inspection ready

ETL certified to CSA C22.2 No. 29 for compliant outdoor service.

PLANNING A COMPLEX LIGHTING PROJECT?

LET’S BUILD YOUR SOLUITON.